The September quarter delivered record safety and concentrate production results, with our growth strategy well underway.
The results mark a strong quarter for the Abra Operation, with investment in key infrastructure supporting increased production and continued operational momentum.
Highlights:
Production Performance
- Total Recordable Injury Frequency Rate (TRIFR) of 2.2, a record under Endurance Mining and industry leading benchmark.
- Ore mined of 361,091 tonnes at 32.5 g/t Ag and 7.6% Pb.
- Ore tonnes processed of 354,341 tonnes, head grades of 32.8g/t Ag and 7.9% Pb.
- Record concentrate produced of 42,722 tonnes and concentrate grades of 216.0g/t Ag and 59.7% Pb.
- Record metal in concentrate produced of 297koz of silver and 25,507 tonnes of lead.
- Crushing circuit upgrades including installation of two additional magnets and optimised screening deck panels have raised throughput rate from ~290dmt/hr to ~340dmt/hr.
- Tailings Storage Facility (TSF) Stage 3 Cell B2 construction completed providing capacity through to October 2028.
Financial Performance
- Q1FY27 EBITDA of A$18.3m, operating cashflow of A$17.6m, and net cashflow of A$1.9m.
- C1 cost of A$0.42/lb and AISC of A$0.60/lb concentrate sold.
- At 30 September 2026, Endurance held A$30.9m in cash and receivables (30 June 2026: A$28.8m).
- Key capital expenditure items for the quarter (A$13.9m) included A$7.0m in mine development, A$1.2m in regional and underground exploration, and A$5.6m in sustaining capital (TSF, processing, NPI).
- Entered into a new offtake agreement with Trafigura for an additional 12 shipments (expected completion November 2028), the new offtake introduces provisions of payable copper and zinc.
Endurance Growth Strategy
- 2027 Mineral Resource Estimate (“MRE”) in development which will for the first time report on copper and zinc, demonstrating the orebody’s polymetallic nature.
- 9,650m Diamond Drill (DD) programme confirmed extensions to the Abra Orebody to the north, east, and west .
- Endurance has planned a follow up programme to test along strike and down-dip continuity of mineralisation in Q2FY27.
- Maiden Inferred Mineral Resource Estimate at Manganese Range scheduled for completion Q4FY27.
- Earthworks commenced to support the regional exploration programme scheduled for Q2FY27 at Manganese Range and Copper Chert.
- To support the Abra Underground Exploration Programme a third diamond drill rig arrived at the mine site during the quarter.
- Outstanding results from 2,694m Reverse Circulation (RC) regional exploration programme at Manganese Range and Copper Chert
Matthew Hine, Endurance Mining’s CEO and Managing Director said:
“The September Quarter marked another significant milestone for Endurance Mining, with record safety and concentrate production, strong operating cashflow generation and continued investment and exploration reinforcing the substantial growth potential of the Abra operation.
“Our 9,650m underground exploration programme delivered highly encouraging results, identifying new zones of mineralisation beyond the existing 2026 Mineral Resource Estimate. Importantly, drilling has delineated a 300m zone north of the Abra Fault, an area which has historically seen limited exploration, alongside a further 150m zone of mineralisation west of the existing Resource boundary. Step-out drilling to the east has also confirmed continuity of mineralisation, highlighting the significant potential to expand the Abra Resource and extend the mine life.
“These results reinforce our confidence in the broader mineralised system at Abra, with follow-up drilling scheduled to commence in Q2 FY27. In parallel, we are progressing our 2027 Mineral Resource Estimate, including the incorporation of copper and zinc, as we seek to unlock additional value from the deposit.
“Our record production of 42,722 tonnes of concentrate generated A$17.6 million in operating cash flow, demonstrating the tangible benefits of our recent investment in processing infrastructure. Pleasingly, our TRIFR also reduced from 4.6 to 2.2, reflecting our continued commitment to safety.
“With a strengthened financial position, improving operational performance and multiple emerging exploration opportunities, Endurance is well positioned to pursue its growth strategy and realise the broader potential of Abra’s endowment.”